Skip to main content
Loading
Cart
Sections
Toggle search
Toggle navigation
Keyword Search
Sign In
This item is out of production
A295--2008- General Conditions of the Contract for Integrated project Delivery
AIA Document A295–2008, provides the terms and conditions for AIA Documents A195–2008 Standard Form of Agreement Between Owner and Contractor for Integrated Project Delivery, and B195–2008, Standard Form of Agreement Between Owner and Architect for Integrated Project Delivery, both of which incorporate AIA Document A295–2008 by reference. Those agreements provide primarily only business terms and rely upon A295–2008 for the architect’s services, the contractor’s pre-construction services, and the conditions of construction. A295 not only establishes the duties of the owner, architect and contractor, but also sets forth in detail how they will work together through each phase of the project: conceptualization, criteria design, detailed design, implementation documents, construction, and closeout. A295 requires that the parties utilize building information modeling.
Discounted price:
14.99
Your price:
19.99
Must be between 0 and 1000000.
You could save:
25.0%
Quantity:
Quantity is required.
Quantity must be a positive whole number.
Similar products
A102--2017 Standard Form of Agreement Between Owner and Contractor where the basis of payment is the Cost of the
Standard form of Agreement-Owner/CMA-cost+fee
{1}
##LOC[OK]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
##LOC[Cancel]##